Construction Project Planner Average Salary in Australia 2026

How much money does a person working as Construction Project Planner make in Australia?


Average Yearly Salary
87,700 AUD
( 7,310 AUD monthly)

LOW
41,200
AUD
AVERAGE
87,700
AUD
HIGH
139,000
AUD
All salary figures displayed here are per year except when noted otherwise.
All salary and compensation figures displayed here are gross salary figures, that is the salary before tax deductions. Because taxes may differ across sectors and locations, it is difficult to accurately calculate the net salary after tax for every career.

A person working as Construction Project Planner in Australia typically earns around 87,700 AUD. Salaries range from 41,200 AUD (lowest) to 139,000 AUD (highest).


Salary Variance

This is the average salary including housing, transport, and other benefits. Construction Project Planner salaries in Australia vary drastically based on experience, skills, gender, or location. Below you will find a detailed breakdown based on many different criteria.

Construction Project Planner Pay Scale and Salaries in Australia

Median Salary, maximum and minimum salary, minimum wage, starting salary, and the salary range

All salary figures displayed here are per year except when noted otherwise.
  • Salary Range, Minimum Wage, and Starting Salary

    Salaries for the position Construction Project Planner in Australia range from 41,200 AUD (starting salary) to 139,000 AUD (maximum salary). It should be noted that the given figure is not the legally mandated minimum wage; rather, it represents the lowest figure reported in a salary survey that included thousands of participants and professionals from all regions of the country.

  • Median Salary

    With a median salary of 83,200 AUD, half of the professionals who work as Construction Project Planner in Australia earn less than this amount, and the other half earn more. The median salary denotes the middle value of salaries. Ideally, you would want to belong to the group earning more than the median salary, located on the right side of the salary distribution graph.

  • Percentiles and Salary Scale

    The median is closely associated with two other values known as the 25th and 75th percentiles. By examining the salary distribution chart, it can be determined that 25% of professionals employed as Construction Project Planner in Australia earn less than 67,400 AUD, while 75% earn more. Similarly, the chart shows that 75% earn less than 95,600 AUD while 25% earn more.

  • Pay Scale Structure

    To provide a better understanding of expected salaries, we categorized the frequently occurring salaries into different ranges. This approach provides a more precise representation of salary distribution for the job title Construction Project Planner in Australia compared to simply calculating the average. The majority of reported salaries, approximately 65%, fall within the range of 50,500 AUD to 72,600 AUD. About 20% of salaries are below the 50,500 AUD mark, while 10% fall within the range of 72,600 AUD to 82,600 AUD. Only 5% of individuals have salaries exceeding 82,600 AUD.


Median and salary distribution Australia Construction Project Planner

Salary Comparison by Years of Experience / Construction Project Planner / Australia

How do experience and age affect pay?

0 - 2 Years
47,600 AUD
2 - 5 Years+38%
65,600 AUD
5 - 10 Years+42%
93,300 AUD
10 - 15 Years+22%
114,000 AUD
15 - 20 Years+6%
120,000 AUD
20+ Years+9%
131,000 AUD
Percentage increase and decrease are relative to the previous value

The experience level is the most important factor in determining the salary. Naturally, the more years of experience the higher the wage. We broke down salaries by experience level for people working as Construction Project Planner and this is what we found.


All salary figures displayed here are per year except when noted otherwise.

Employees with less than two years of experience earn approximately 47,600 AUD.

While someone with an experience level between two and five years is expected to earn 65,600 AUD, 38% more than someone with less than two year's experience.

Moving forward, an experience level between five and ten years lands a salary of 93,300 AUD, 42% more than someone with two to five years of experience.

Additionally, professionals whose expertise span anywhere between ten and fifteen years get a salary equivalent to 114,000 AUD, 22% more than someone with five to ten years of experience.

If the experience level is between fifteen and twenty years, then the expected wage is 120,000 AUD, 6% more than someone with ten to fifteen years of experience.

Lastly, employees with more than twenty years of professional experience get a salary of 131,000 AUD, 9% more than people with fifteen to twenty years of experience.

“ On average, a person's salary doubles their starting salary by the time they cross the 10 years* experience mark. ”
* Based on the average change in salary over time. Salary variations differ from person to person.

Typical Salary Progress for Most Careers

Salary Comparison By Experience Level

Salary Comparison By Education / Construction Project Planner / Australia

How do education levels affect salaries?

Displayed below is the average salary variance between different education levels of professionals working as Construction Project Planner.

Bachelor's Degree
65,600 AUD
Master's Degree+83%
120,000 AUD
Percentage increase and decrease are relative to the previous value

We all know that higher education equals a bigger salary, but how much more money can a degree add to your income? We broke down salaries by education level for the position Construction Project Planner in order to make a comparison.


Level 1: Bachelor's Degree

Employees at this education level have an average salary of 65,600 AUD.


Level 2: Master's Degree

At this level, the average salary becomes 120,000 AUD, 83% more than the previous level.



Is a Master's degree or an MBA worth it? Should you pursue higher education?

A Master's degree program or any post-graduate program in Australia costs anywhere from 38,000 AUD to 114,000 AUD and lasts approximately two years. That is quite an investment.

You can't really expect any salary increases during the study period, assuming you already have a job. In most cases, a salary review is conducted once education is completed and the degree has been attained.

Many people pursue higher education as a tactic to switch to a higher-paying job. The numbers seem to support the theory. The average increase in compensation while changing jobs is approximately 10% more than the customary salary increment.

If you can afford the costs of higher education, the return on investment is definitely worth it. You should be able to recover the costs in roughly a year or so.


Typical Salary Difference by Education for Most Careers

Salary Comparison By Education Level

Salary and Compensation Comparison By Gender / Construction Project Planner / Australia

Salary comparison by gender Australia Construction Project Planner

Though gender should not have an effect on pay, in reality, it does. So who gets paid more: men or women? For the people who work as Construction Project Planner in Australia, the average difference between the salary of male and female employees is 6%.

Male
90,300 AUD
Female-5%
85,400 AUD
Percentage increase and decrease are relative to the previous value

Average Annual Salary Increment Percentage / Construction Project Planner / Australia

How much are annual salary increments in Australia for individuals working as Construction Project Planner? How often do employees get salary raises?

Individuals working as Construction Project Planner in Australia are likely to observe a salary increase of approximately 9% every 18 months. The national average annual increment for all professions combined is 8% granted to employees every 16 months.

Annual Salary Increment Rate Australia Construction Project Planner

The figures provided here are averages of numbers. Those figures should be taken as general guidelines. Salary increments will vary from person to person and depend on many factors, but your performance and contribution to the success of the organization remain the most important factors in determining how much and how often you will be granted a raise.

The term Annual Salary Increase usually refers to the increase in 12 calendar month period, but because it is rare that people get their salaries reviewed exactly on the one-year mark, it is more meaningful to know the frequency and the rate at the time of the increase.

How to calculate the salary increment percentage?

The annual salary Increase in a calendar year (12 months) can be easily calculated as follows: Annual Salary Increase = Increase Rate x 12 / Increase Frequency

“The average salary increase in one year (12 months) in Australia is 6%.”

Worldwide Salary Raises: All Countries and All Jobs

World Average Annual Salary Increment

Salary Packages and Schemes

Not all compensation increases are reflected directly in the salary. Some companies offer upgraded packages to their staff instead of cash money. The figures displayed here account only for direct increments to the base salary.

Bonus and Incentive Rates / Construction Project Planner / Australia

How much and how often are bonuses being awarded?Annual Salary Bonus Rate Australia Construction Project Planner

41% of surveyed staff reported that they haven't received any bonuses or incentives in the previous year while 59% said that they received at least one form of monetary bonus.

Those who got bonuses reported rates ranging from 2% to 7% of their annual salary.

Received Bonus
59%
No Bonus
41%

Types of Bonuses Considered

Individual Performance-Based Bonuses

The most standard form of bonus, where the employee is awarded based on their exceptional performance.

Company Performance Bonuses

Occasionally, some companies like to celebrate excess earnings and profits with their staff collectively in the form of bonuses that are granted to everyone. The amount of the bonus will probably be different from person to person depending on their role within the organization.

Goal-Based Bonuses

Granted upon achieving an important goal or milestone.

Holiday / End of Year Bonuses

These types of bonuses are given without a reason and usually resemble an appreciation token.

Bonuses Are Not Commissions!

People tend to confuse bonuses with commissions. A commission is a prefixed rate at which someone gets paid for items sold or deals completed while a bonus is in most cases arbitrary and unplanned.


What makes a position worthy of good bonuses and a high salary?

The main two types of jobs

Revenue GeneratorsSupporting Cast

Employees that are directly involved in generating revenue or profit for the organization. Their field of expertise usually matches the type of business.

Employees that support and facilitate the work of revenue generators. Their expertise is usually different from that of the core business operations.

Example:
A graphics designer working for a graphics designing company.

Example:
A graphic designer in the marketing department of a hospital.


Revenue generators usually get more and higher bonuses, higher salaries, and more frequent salary increments. The reason is quite simple: it is easier to quantify your value to the company in monetary terms when you participate in revenue generation.

“Try to work for companies where your skills can generate revenue. We can't all generate revenue and that's perfectly fine.”

Bonus Comparison by Seniority Level

Top management personnel and senior employees naturally exhibit higher bonus rates and frequencies than juniors. This is very predictable due to the inherent responsibilities of being higher in the hierarchy. People in top positions can easily get double or triple bonus rates than employees down the pyramid.

Average Hourly Wage / Construction Project Planner / Australia


42 AUD per hour

The average hourly wage (pay per hour) for individuals working as Construction Project Planner in Australia is 42 AUD.This is the rate they get paid for every worked hour.


Hourly Wage = Annual Salary / ( 52 x 5 x 8 )

About The Hourly Pay Rate

The hourly wage is the salary paid in one worked hour. Usually, jobs are classified into two categories: salaried jobs and hourly jobs. Salaried jobs pay a fixed amount regardless of the hours worked. Hourly jobs pay per worked hour. To convert salary into hourly wage the above formula is used (assuming 5 working days in a week and 8 working hours per day which is the standard for most jobs). The hourly wage calculation may differ slightly depending on the worked hours per week and the annual vacation allowance. The figures mentioned above are good approximations and are considered to be the standard. One major difference between salaried employees and hourly paid employees is overtime eligibility. Salaried employees are usually exempt from overtime as opposed to hourly paid staff.

What is the minimum hourly rate of pay?

The minimum pay rate per hour for people working as Construction Project Planner in Australia is 20 AUD. This is the minimum as per the gathered data in the salary survey not the minimum hourly rate mandated by law.

Salary comparison with similar jobs

Job TitleAverage Salary
Construction / Building / Installation
3D Printing Construction Technician61,400 AUD-30%
Adjudicator35,700 AUD-59%
Assembler28,800 AUD-67%
Boat Builder and Shipwright42,300 AUD-52%
Bricklayer24,500 AUD-72%
Building Administrator39,200 AUD-55%
Building Automation Engineer90,000 AUD+3%
Building Contracts Manager138,000 AUD+57%
Building Information Modeling Manager113,000 AUD+29%
Building Inspector38,100 AUD-57%
Building Monitor28,900 AUD-67%
Building Sales Manager126,000 AUD+44%
Building Systems Integration Specialist83,900 AUD-4%
Cabinetmaker31,400 AUD-64%
Carpenter35,400 AUD-60%
Civil Engineer88,800 AUD+1%
Civil Technician42,900 AUD-51%
Concreter28,300 AUD-68%
Construction and Building Inspector37,400 AUD-57%
Construction and Maintenance Manager73,000 AUD-17%
Construction Assistant36,700 AUD-58%
Construction Coordinator48,500 AUD-45%
Construction Data Analyst78,900 AUD-10%
Construction Estimator54,600 AUD-38%
Construction Field Engineer74,400 AUD-15%
Construction General Manager155,000 AUD+77%
Construction Inventory Officer31,600 AUD-64%
Construction Manager159,000 AUD+81%
Construction Operations Manager140,000 AUD+60%
Construction Project Controls Manager111,000 AUD+27%
Construction Project Coordinator90,400 AUD+3%
Construction Project Engineer87,900 AUD+0%
Construction Project Manager154,000 AUD+76%
Construction Project Planner87,700 AUD-0%
Construction Quality Control Manager111,000 AUD+27%
Construction Robotics Engineer93,700 AUD+7%
Construction Safety Officer57,400 AUD-35%
Construction Superintendent54,200 AUD-38%
Construction Supervisor85,200 AUD-3%
Construction Technical Assistant33,700 AUD-62%
Construction Technical Officer37,400 AUD-57%
Construction Technical Writer34,800 AUD-60%
Construction Technician32,500 AUD-63%
Construction Waste Management Consultant89,700 AUD+2%
Construction Worker25,700 AUD-71%
Crane and Tower Operator31,300 AUD-64%
Crane Operator30,300 AUD-65%
Diesel Mechanic30,000 AUD-66%
Digital Construction Manager98,300 AUD+12%
Draughtsman26,600 AUD-70%
Drywall Installer32,700 AUD-63%
Electrical Draftsman31,100 AUD-65%
Electrical Engineering Supervisor101,000 AUD+15%
Electrical Engineering Technician36,100 AUD-59%
Electrical Supervisor66,000 AUD-25%
Electrician47,300 AUD-46%
Elevator Installer and Repairer39,300 AUD-55%
Engineer84,100 AUD-4%
Excavator Operator28,900 AUD-67%
Field Inspector52,400 AUD-40%
Floor Finisher32,900 AUD-62%
Floor Manager49,700 AUD-43%
Foreman25,000 AUD-72%
Frame and Truss Detailer27,900 AUD-68%
Furniture Finisher29,600 AUD-66%
Gas Technician 28,400 AUD-68%
Handyman27,800 AUD-68%
Health and Safety Coordinator36,000 AUD-59%
Health and Safety Officer40,800 AUD-53%
Installation Manager104,000 AUD+19%
Installer27,300 AUD-69%
Insulation Installer29,400 AUD-66%
Labourer23,900 AUD-73%
Land Surveyor40,400 AUD-54%
Lean Construction Specialist85,800 AUD-2%
Lift Technician30,900 AUD-65%
Maintenance Foreman26,600 AUD-70%
Material Tester44,100 AUD-50%
Model Maker42,300 AUD-52%
Order Picker26,500 AUD-70%
Painter30,000 AUD-66%
Pipe Layer23,400 AUD-73%
Pipe Welder25,400 AUD-71%
Pipefitter23,800 AUD-73%
Plumber31,700 AUD-64%
Prefabrication and Modular Construction Specialist84,000 AUD-4%
Property Coordinator74,000 AUD-16%
Purchasing Manager107,000 AUD+22%
Quantity Estimator55,600 AUD-37%
Quantity Surveyor58,000 AUD-34%
Roof Slater and Tiler27,900 AUD-68%
Sheet Metal Mechanic28,300 AUD-68%
Sheet Metal Worker25,000 AUD-72%
Site Clerk30,400 AUD-65%
Site engineer75,000 AUD-15%
Site Leader147,000 AUD+68%
Stock Controller41,800 AUD-52%
Structural Steel Construction Worker31,800 AUD-64%
Sustainable Materials Engineer81,900 AUD-7%
Technical Draughtsman35,600 AUD-59%
Tender Manager134,000 AUD+53%
Tendering Manager126,000 AUD+44%
Tower Crane Operator29,900 AUD-66%
Wall and Floor Tiler28,000 AUD-68%
Warehouse Manager99,300 AUD+13%
Welder25,900 AUD-70%
Welding Superintendent33,200 AUD-62%

Salary Comparison By City

CityAverage Salary
Melbourne94,800 AUD
Sydney88,700 AUD

Government vs Private Sector Salary Comparison

Where can you get paid more, working in a private company or the government? The difference between the public or government sector salaries and the private sector salaries in Australia is 5% on average across all career fields.

Private Sector
89,000 AUD
Public Sector+5%
93,400 AUD
Percentage increase and decrease are relative to the previous value

Salary Statistics and Calculation Guide

What is considered to be a good and competitive salary for the job title Construction Project Planner in Australia?

A good and competitive compensation would range anywhere between 83,200 AUD and 95,600 AUD. This is a very rough estimate. Experience and education play a very huge part in the final earnings.

Gross Salary (before tax) and Net Salary (after tax)

All salary and compensation figures displayed here are gross salary figures, that is the salary before tax deductions. Because taxes may differ across sectors and locations, it is difficult to accurately calculate the net salary after tax for every career.

Base / Basic Salary

The base salary for a careers like Construction Project Planner in Australia ranges from 41,200 AUD to 67,400 AUD. The base salary depends on many factors including experience and education. It is not easy to provide a figure with very little information, so take this range with a grain of salt.


What is the difference between the median and the average salary?

Both are indicators. If your salary is higher than both the average and the median then you are doing very well. If your salary is lower than both, then many people earn more than you and there is plenty of room for improvement. If your wage is between the average and the median, then things can be a bit complicated. We wrote a guide to explain all about the different scenarios.

SALARIES

© 2026